Follow code-verified signing, an optional deposit invoice, a change order and phone payment through the customer portal until the example balance reaches zero.
SlabOS workflow article · 07Documentation review · September 15, 2026
Give the customer a clear view of the current quote and its approval state.
The customer portal connects the customer-facing view to SlabOS quote and job information. It provides a place to review the presented work and the available document actions. The essential operational question is which revision the customer is seeing and what action they have actually completed.
Sending a link, opening it and signing a document are different events. Keep the quote’s current state and the portal’s published version aligned, especially when the job changes after an earlier signature. The shop should be able to retrieve the accepted document rather than infer approval from a viewed notification.
Inputs, outputs and an example to evaluate
Inputs: The selected customer-facing quote revision, documents and project information.
Outputs: A project view and applicable customer actions tied to that work.
Show the same synthetic project in office and customer views, including one document and its recorded customer action.
Scope to understand
Quote acceptance, template signoff and change-order approval are separate records. A signature on one does not automatically approve all three.
Published by SlabOS. Documentation review: September 15, 2026. Basis: Public product and operating documentation. This article is a workflow explanation, not a newly performed product test.
SlabOS can furnish the selected countertop with fitted cabinets, sinks and cooktops, place a slide-in range in a supported appliance opening and optionally add a hood. The proposed scene is previewed before applying, and each item remains customizable. The same 3D workspace supports automatic stone assembly and a customer-ready room presentation. Read the Automatic 3D & kitchen furnishing page →
The current portal page connects branded project access, actual-slab 3D and AR, page-by-page drawing approval, retained signed revisions, project status and payments. A customer response remains associated with its intended document and revision. Read the Customer Portal page →
Explore the capability in context
Continue into the related public explanations for inputs, outputs and scope.
See the platform in the context of a shop workflow, from setup and estimating through the job.
SLABOS IN MOTION 03 FILMS
SEE THE WORKFLOW.IN MORE DETAIL.
A closer look at the decisions, details and handoffs that make the work happen.
I Never Signed That
Three weeks after install: "I never signed that." In SlabOS, signing takes a one-time emailed code that expires in 10 minutes. Wrong code, nothing signs. Replaced drawing, refused. The signed drawing carries its own verification record. slabos.com
Keep the customer portal on the published quote revision while you edit. Press Update Portals to share the revision; job progress, photos and invoices continue updating live.
Present multiple color options on one quote link. The customer's selection approves the option and notifies the shop so it can prepare the contract or refine the quote.