SlabOS public evidence register
Published by SlabOS · Evidence reviewed through September 15, 2026
This register separates public documentation, authorized private inspection suitable for a redacted report, company-reported process and claims not established by the review. SlabOS commissioned the AI-assisted review. No private records or code are published. A public product link describes scope; it does not make underlying private evidence independently accessible.
E01 — Migration-marked destination volume
Status: Privately examined; suitable for redacted public report
155,274 quotes; 111,073 jobs; 1,178,680 job activities. September 15 authorized aggregate check.
Method: Existing migration/source-marked destination rows; identified demo account and deleted activities excluded; archive copies not added.
Limit: Not an accuracy rate, active-customer count or feature-usage measure.
E02 — Migration scope
Status: Company-confirmed completed migrations; supporting private inspection for portions of the scope
SlabOS confirms completed migrations from Moraware, CounterGo, StoneApp, EasedEdge, Stonify, ActionFlow and Stone Profit Systems. Inspected evidence also supports broad Moraware/CounterGo scope, StoneApp/EasedEdge provenance markers and supported structured order payments.
Method: Direct SlabOS confirmation on September 15, 2026, plus earlier authorized source inspection and aggregate provenance review. The company confirmation updates the earlier source-coverage assessment.
Limit: Completed migrations do not by themselves establish identical field coverage for every source, a measured accuracy rate or whole-ledger reconciliation. Agree each shop's migration scope.
E03 — Owner migration walkthrough
Status: Company-reported
SlabOS describes owner review and discrepancy resolution as its delivery process.
Method: Company process statement.
Limit: Not independently witnessed here; unmeasured error statements are not an accuracy percentage.
E04 — Individual slab and remnant workflows
Status: Public and examined; supplemented by private inspection
Identity, partial receiving, quote holds, job commitments, consumption and parent-linked remnants.
Method: Public help plus authorized source/screenshots.
Limit: Complete same-material lifecycle reconciliation remains to be published.
Physical slab inventory and planned slab layouts
E05 — Labels and scanning
Status: Public and examined; supplemented by private inspection
Barcode, QR and registered RFID identification; custom label and scan workflows.
Method: Public instructions and authorized source review.
Limit: Physical RFID hardware not tested; inventory labels distinct from Demo-beta piece-label designer.
Slab identity, labels and scanning
E06 — Warehouse placement
Status: Public and examined
Buildings, bays, recorded location, placement and capacity-related controls.
Method: Public product/help text; private workflow inspection.
Limit: Recorded location is not continuous automatic physical tracking.
Warehouse maps, rack locations and slab placement
E07 — Nesting controls
Status: Public and examined; supplemented by private inspection
Veined Material, Tightest Fit, allowances, adjustments and preserved locked layouts; other modes beta.
Method: Public help/product and source inspection.
Limit: No matched-job yield winner or universal optimum established.
Physical slab inventory and planned slab layouts
E08 — Takeoff beta measurements
Status: Public and examined
40 sessions; 364 classified sheets; 129 committed regions on September 15.
Method: Live public page read; definitions and blind spots examined.
Limit: Shape-edit retention is not overall accuracy; September 15 reread is not a new algorithm test.
E09 — Takeoff access and operation
Status: Public and examined
Saved-quote PDF pilot entry; editable geometry and estimator review instructions.
Method: Public help page read.
Limit: Help identifies Demo-pilot availability; confirm access per shop; not a fabrication templating replacement.
Blueprint takeoff from countertop plan sets
E10 — QuickBooks Online workflow
Status: Public and examined
Documented invoice import/push, payments, job matching, tax/item mappings and failure controls.
Method: Detailed public guide read.
Limit: Tutorial uses sample accounting responses; no live-company transaction reconciliation performed in this audit; not QuickBooks Desktop.
QuickBooks Online and countertop job billing
E11 — Job cost calculation
Status: Public and examined
Documented material/labor/equipment/fuel/overhead rules and actual/scheduled/estimated inputs.
Method: Detailed public guide read.
Limit: Configured cost model, not audited general ledger; historical recalculation and location fallbacks require attention.
Labor, equipment and overhead inputs for job costing
E12 — Scheduling and job conversion
Status: Public and examined
Quote-to-job and event/crew scheduling procedures exist publicly.
Method: Public help text examined.
Limit: No measured throughput gain or complete linked job result established by reading guides.
Scheduling countertop jobs and crew assignments
E13 — SlabBridge: Slabsmith and Horus integration
Status: Current capability confirmed by SlabOS; Windows service and Slabsmith writeback examined in code
SlabOS confirms two-way Slabsmith integration and Horus scanner imagery feeding slab images through its Windows service.
Method: Owner confirmation on September 15, 2026; repository inspection of the Windows service, inventory synchronization and create/update writeback.
Limit: This documentation review does not claim a newly executed live-shop round-trip or scanner test. The inspected Horus adapter alone is not the source of the scanner-imagery claim; that update is company-confirmed.
E14 — CAD and fabrication export
Status: Public and examined
CAD/DXF workflow, geometry checks and access conditions documented.
Method: Public product/help read.
Limit: No machine-specific CAM/toolpath acceptance established by an export capability.
CAD geometry and laser-templating handoffs
E15 — Crew and offline behavior
Status: Public and examined; supplemented by private inspection
Crew tasks, capture/scanning and documented permissions.
Method: Public help plus prior source inspection.
Limit: Queued captures do not establish fully offline application operation; device tests remain scoped.
SlabOS Crew App for countertop field work
E16 — Commercial scope
Status: Public and examined
Published agreed-price/unlimited-user offer and included migration/setup/training.
Method: Current pricing page and public terms examined.
Limit: Written offer controls scope and exceptions; no universal fixed price or guaranteed ROI.
E17 — Named customer outcomes and multi-site scale
Status: Not established for the requested causal claims
Public stories and review links exist; migration aggregate evidence is separate.
Method: Public pages examined.
Limit: Consented attribution, baseline, period, workload and result verification still needed for the claimed yield/win or scale outcome.
E18 — Trade-show organizer corroboration
Status: Not established in this update
SlabOS event pages exist.
Method: Owned event pages inventoried; organizer status not newly rechecked.
Limit: An owned event page does not establish exhibitor listing or third-party endorsement.