Measured Not Sold
Template correction: the templater's DXF drops into the sold quote, every piece files to its matching area, the price change rolls up to a revised total, and the customer e-signs the change before the quote locks.
Open video ↗SLABOS WORKFLOWS / Change Order Signed v2
Revised Change Order. Signed. (v2): the same change-order story, re-rendered without the two one-frame black flashes.
Change Order Signed v2Watch the workflow. Put it to work in your shop.
Keep revised geometry, changed price and customer approval together.
SlabOS distinguishes Template Correction, Change Order and Separate add-on. A template correction handles measured changes; a change order revises the original quote’s scope; a separate add-on creates another quote attached to the job. Choosing the correct path prevents the same work from being charged twice.
The change comparison connects the prior scope with the revised drawing and price. Review additions, removals, quantity differences and zero-price changes. Previous total plus total change should reconcile to the revised amount, including applicable tax and adjustments. Saving the edit, publishing a portal revision, sending it and obtaining approval are separate steps.
Inputs: The original quote, corrected measurements or requested scope changes.
Outputs: A revised drawing and price comparison, with an approval record where that workflow is used.
Compare a sample quote before and after a dimension change and an added piece; reconcile the total difference.
Moving old pieces aside for a DXF comparison does not remove them from the quote. Remove superseded geometry before accepting final quantities.
Published by SlabOS. Documentation review: September 15, 2026. Basis: Public product and operating documentation. This article is a workflow explanation, not a newly performed product test.
Follow this capability into the connected quote-to-install journey:
The current portal page connects branded project access, actual-slab 3D and AR, page-by-page drawing approval, retained signed revisions, project status and payments. A customer response remains associated with its intended document and revision. Read the Customer Portal page →
SlabOS CAD connects command-driven drafting and countertop-specific geometry to the quote, nest and 3D view. The current page describes seven seam modes, a geometry Check before Print or DXF export, and beta laser Template Mode that captures measured points through a USB connection. Read the CAD & Laser Templating page →
Continue into the related public explanations for inputs, outputs and scope.
See the customer-facing drawing, document and project experience.
Explore exact geometry, drawing revisions and templating handoffs alongside this workflow.
Place this capability within SlabOS estimating, production, inventory and office work.
Connect customer messages and attachments to their quote or job context.
See how countertop geometry, material appearance and the customer presentation connect.
SLABOS IN MOTION 01 FILMS
A closer look at the decisions, details and handoffs that make the work happen.
Template correction: the templater's DXF drops into the sold quote, every piece files to its matching area, the price change rolls up to a revised total, and the customer e-signs the change before the quote locks.
Open video ↗Choose a film to play Explore the collection →
The SlabOS knowledge library
Explore the capability guides, workflow articles, product reports and connected resources behind SlabOS.